WestConnex M4/M5 Link, NSW
Scope
Background
This underground motorway link required modular infrastructure that could be quickly deployed with minimal on-site disruption.
Challenge
Antec Fire needed to fabricate large components in parallel while staging production to support the contractor’s evolving schedule.
Solution
We fabricated deluge manifolds to project specifications and built Emergency Equipment Cabinets with full internal assemblies ready for delivery.
Implementation
Components were batch produced and delivered per tunnel segment to coordinate with construction timelines.
Benefits / Results
Key take-aways
Parallel fabrication enables just-in-time delivery for large tunnel projects.
Why this project matters for Antec
Demonstrates our ability to produce core tunnel fire systems with speed, precision, and a modular mindset.