Scope

  • Supply of hydrant pipe, Victaulic fittings and valves

Background

The multi-contractor joint venture required coordinated supply of compliant components for use across a major underground rail line.

 

Challenge

Maintaining specification and compliance across state lines and multiple construction crews posed both logistical and technical challenges.

 

Solution

Antec Fire delivered hydrant piping and fittings in staged consignments, supported by our internal QA systems and dedicated interstate project coordination.

 

Implementation

Materials were staged for delivery based on access and construction sequencing, with supplier reports issued for each consignment.

 

Benefits / Results

  • On-spec supply of critical fire protection assets
  • Consistent coordination across joint venture teams
  • Maintained compliance and delivery performance

Key take-aways

Working interstate requires robust systems and open contractor collaboration.

 

Why this project matters for Antec

This project affirms Antec Fire’s national delivery footprint and ability to support joint ventures with complete fire system components.