Background
The Westgate Tunnel required reliable, tunnel-grade infrastructure capable of withstanding harsh conditions and fast installation timelines.
Challenge
Antec Fire had to supply long-lead materials on an accelerated schedule to avoid construction delays.
Solution
We coordinated the rapid delivery of all required components while fabricating bespoke deluge manifolds to match site design requirements.
Implementation
Pipework and fittings were packaged and delivered in synchronised batches with pre-fabricated manifold assemblies.
Benefits / Results
Key take-aways
Local fabrication and material readiness can mitigate lead-time risk on major transport jobs.
Why this project matters for Antec
This project underscores our role as a responsive, high-capability supplier on key Victorian infrastructure projects.